Miss-Delectable
New Member
- Joined
- Apr 18, 2004
- Messages
- 17,160
- Reaction score
- 7
Virginia School for the Deaf and the Blind Library Media Center, Staunton | American Libraries Magazine
Reclamations and Renovations: The Stuart Building, which now houses a 4,400-square-foot library and a student center, was built in 1914 and originally held classrooms, workshops, and a swimming pool. For many years, however, the building had been used for storage. The renovation created a flexible and accessible space within the framework of the historical building, with a new passenger elevator and exposed ceiling-beam architecture.
Reclamations and Renovations: The Stuart Building, which now houses a 4,400-square-foot library and a student center, was built in 1914 and originally held classrooms, workshops, and a swimming pool. For many years, however, the building had been used for storage. The renovation created a flexible and accessible space within the framework of the historical building, with a new passenger elevator and exposed ceiling-beam architecture.